Eagles Green, Warrington – Anwyl Homes

Eagles Green, Warrington – Anwyl Homes

Duration: December 2024 (2 Weeks)
Value: £70,000
Plant: 4 Articulated dumptrucks, 1 50t excavator, One D6 dozer with a pap blade and 1 D6 dozer with a straight blade.

In a recent fast-tracked project, we were engaged to relocate 10,000m³ of material within a housing development site. The task involved transporting the material across the site and distributing it into three designated stockpiles. Additionally, we were instructed to identify and remove any hotspots, which were promptly excavated to ensure site safety and compliance.

To facilitate the creation of one of the stockpiles, we conducted a vegetation scrub and grubbing exercise. This process entailed the removal of trees, shrubs, and other vegetation, followed by the extraction of stumps and roots to a depth of at least 0.5 meters below the natural surface, as per standard earthworks procedures .

Despite the project’s tight 10-day deadline, our team mobilized a substantial fleet of machinery to maintain efficiency and meet the client’s completion date. A final push before the Christmas break ensured the successful and timely delivery of the project, satisfying our client’s expectations.

Related Projects

Tilbury Docks – Graham

Tilbury Docks – Graham

On this project, our team undertook comprehensive earthworks to prepare the site for terminal paving

Hoyles Lane, Cottam – Bethell Utilities

Hoyles Lane, Cottam – Bethell Utilities

We are currently engaged in a significant pipeline installation project in Cottam, Lancashire, as part

Lancaster University Energy Centre – Vital Energi

Lancaster University Energy Centre – Vital Energi

Ruttle Contracting contributed to Lancaster University’s Net Zero initiative by supporting the construction of a