Chester Hospital – Vinci

Chester Hospital – Vinci

Duration: March 2023- June 2023 (3 months)
Value: £615,000
Plant: D6 dozer, 30t excavator, 20t excavator, Bomag 13t roller

In Phase One of this project, we developed a temporary car park for hospital staff during the refurbishment of the existing facility. Our team began by stripping the topsoil across the entire greenfield site, followed by a cut-and-fill operation to level the area. To ensure effective drainage, we imported Type 3 MOT aggregate—known for its reduced fines content and superior permeability compared to Type 1 MOT . This material was compacted in layers, with permeable geotextile membranes placed between each to prevent soil migration and enhance structural stability . The site’s perimeter was then landscaped using the stripped topsoil to create neat bunds, improving both aesthetics and safety. Finally, we installed kerbing to define the parking bays and complete the temporary car park, providing a durable and functional solution for hospital staff during the construction period.

Related Projects

Tilbury Docks – Graham

Tilbury Docks – Graham

On this project, our team undertook comprehensive earthworks to prepare the site for terminal paving

Hoyles Lane, Cottam – Bethell Utilities

Hoyles Lane, Cottam – Bethell Utilities

We are currently engaged in a significant pipeline installation project in Cottam, Lancashire, as part

Lancaster University Energy Centre – Vital Energi

Lancaster University Energy Centre – Vital Energi

Ruttle Contracting contributed to Lancaster University’s Net Zero initiative by supporting the construction of a