Lancaster University Energy Centre – Vital Energi

Lancaster University Energy Centre – Vital Energi

Duration: January 2025- March 2025 (3 Months)
Value: £360,000
Plant: 14t Excavator, 9t Dumper, Hydrema, 1.7t Mini digger, 1200 Roller, 13t Bomag roller, D61 dozer, Tipper hire and 20t Excavator

Ruttle Contracting contributed to Lancaster University’s Net Zero initiative by supporting the construction of a new Low Carbon Energy Centre. This facility is part of the university’s £57 million investment to decarbonise its Bailrigg campus, aiming to virtually eliminate gas heating through state-of-the-art heat pump technology .

Our scope of work commenced with the removal of invasive species from the site, which were transported to an approved facility. Subsequently, we executed a cut-and-fill operation, addressing green waste and historic tree stumps. Inert waste was removed off-site, and 6F5 material was imported to form and compact piling mats. We provided a permanent machine on hire alongside the piling rig for piling attendance. Upon completion of the piling works, we removed the pile mats and transported the material to our recycling facility for processing and reuse.

Further, we graded embankments along the public footpath and imported topsoil using our tipper wagons. This topsoil was laid and landscaped across public open space (POS) and embankment areas. Additionally, we installed a land drain to ensure proper site drainage.

Our involvement in this project underscores our commitment to sustainable construction practices and our support for initiatives that contribute to a low-carbon future.

Related Projects

Tilbury Docks – Graham

Tilbury Docks – Graham

On this project, our team undertook comprehensive earthworks to prepare the site for terminal paving

Hoyles Lane, Cottam – Bethell Utilities

Hoyles Lane, Cottam – Bethell Utilities

We are currently engaged in a significant pipeline installation project in Cottam, Lancashire, as part

Salford Rise – Eric Wright

Salford Rise – Eric Wright

Ruttle Contracting was appointed by Eric Wright Civil Engineering to undertake essential earthworks for the