Ashworth Hospital, Maghull – Vinci

Ashworth Hospital, Maghull – Vinci

Duration: September 2021- May 2022 (8 Months)
Value: £750,000

At Ashworth Hospital in Maghull, we delivered a comprehensive earthworks package to support infrastructure upgrades. We were appointed as the earthworks contractor for the greenfield site, preparing it for a new hospital unit. Our scope of work commenced with a topsoil strip across the site, followed by a reduced level dig to achieve the required formation levels. To manage storm water effectively, we installed an attenuation tank using attenuation crates. Additionally, we imported stone to form a robust piling mat, providing a stable base for future construction activities. Upon completion of the excavation and installation works, we meticulously levelled all excavated materials into a tidy POS area, preparing the site for the next phase of development. This project demonstrates our capability to transform greenfield sites into well-prepared foundations for complex healthcare infrastructure.

Related Projects

Tilbury Docks – Graham

Tilbury Docks – Graham

On this project, our team undertook comprehensive earthworks to prepare the site for terminal paving

Hoyles Lane, Cottam – Bethell Utilities

Hoyles Lane, Cottam – Bethell Utilities

We are currently engaged in a significant pipeline installation project in Cottam, Lancashire, as part

Lancaster University Energy Centre – Vital Energi

Lancaster University Energy Centre – Vital Energi

Ruttle Contracting contributed to Lancaster University’s Net Zero initiative by supporting the construction of a